NEW APAS BRIDGE AT TAWAU, SABAH
Services provided
Design and supervision
Project Description

The main objective of the consultancy services for the flood mitigation project for Tawau River Basin is to prepare a detailed engineering design and tender table documents for the purpose of implementing a flood mitigation project to overcome the flooding problems.

The existing Apas bridge needs to be replaced. The new bridge spans a length of 42m and will accommodate a dual carriageway (4 lanes).

Project Details
Client
Client:
Jabatan Pengairan dan Saliran Sabah
Date
Year:
2016