MENGKUANG DAM EXPANSION PROJECT, PENANG
Services provided
Design and supervision
Project Description

The expansion of Mengkuang Dam involves heightening the existing dam by 10m and a construction of a 50m high dam on the adjacent valley to form a unified dam about 3km long.

A new draw-off tower to replace the existing tower and access bridge are required. Besides, a new draw-off tunnel and valve chamber with outlet pipe works and accessbridge at left abutment of the new dam are required.

Project Details
Client
Client:
Kementerian Tenaga, Teknologi Hijau dan Air Malaysia
Date
Year:
2011 to 2017