BAKUN HYDROELECTRIC PROJECT (PACKAGE CW2) – MAIN CIVIL WORKS
Services provided
Services Provided: Design and Supervision
Project Description

MCHJV has engaged ACS to design the log boom. The log boom is used to prevent floating logs from entering the power intake and spillway entrance. The entire log boom consists of 6 series of floating booms with boom length varies from 60m to 231m. The total length of the floating boom is 742m. The floating booms are supported by 8 fixed anchors.

Project Details
Client
Client:
Malaysia China Hydro Joint Venture
Date
Year :
2007 to 2010