HYDROPOWER ENGINEERING
| Project Title |
: |
Bakun Hydroelectric Project, Sarawak (2500 MW) |
|
| Client |
: |
Malaysia China Hydro JV |
| Services provided |
: |
Sub-Consultancy Services |
| Project Description |
: |
ACS was engaged by the Turnkey Contractor, MCHJV to undertake part of the design work for the main civil works component (value of works RM 1.75 Billion) of the Bakun Hydroelectric Project. The project involves a 205m high Concrete Faced Rockfill Dam (CFRD), 8 nos 315MW turbines housed in a surface power station at downstream toe of the dam. Four bays gated chute spillway on the left abutment, a large 8 bay power intake structure, 8 power tunnels, a low level outlet and access road. |
| Project Title |
: |
Sg Perting Mini Hydropower Plant, Pahang |
 |
| Client |
: |
Arab Malaysia Development Bhd (AMDB) |
| Services provided |
: |
Feasibilty Study, Design & Construction Supervision |
| Project Description |
: |
ACS was appointed by AMDB to carry out a feasibility study, detailed design, contract administration and construction supervision of the mini hydropower project to produce 4 MW of electricity under the Renewable Energy Programme. |
| Project Title |
: |
Limbang Hydroelectric Project |
|
| Client |
: |
Loh & Loh Constructions Sdn Bhd |
| Services provided |
: |
Premilinary Engineering Design |
| Project Description |
: |
ACS carried out a preliminary engineering design, cost estimates and tender documentation of turnkey proposal for the Limbang Hydroelectric Project .Scope of engineering works consist of hydrology study, power potential study, geological study, preliminary engineering design of the 90m high RCC dam, power intake, penstock, power house with 3 Francis Turbines 187 MW capacity and two 11m diameter diversion tunnels. |
| Project Title |
: |
Feasibility Study of Nam Sane 3 Hydropower Project, Lao PDR |
|
| Client |
: |
Rohas Eucos Bhd |
| Services provided |
: |
Feasibilty Study |
| Project Description |
: |
The proposed Nam Sane 3 Hydropower Project is located in Xieng Khouang Province of LAO PDR. on the Nam Sane River. The location of the project is approximately 175km Northeast of Vientiane. ACS was engaged by ROHAS EUCOS Bhd to carry out the feasibility study of the project |
| Project Title |
: |
Rajdhani Hydropower Project , Pakistan |
|
| Client |
: |
IQBAL Power Ltd. |
| Services provided |
: |
EPC Tender Documentation |
| Project Description |
: |
Rajdhani Hydropower Project is located at the downstream reaches of the Punch River in Azad Jammu & Kashmir. This is a Build Operate Transfer (BOT) project and the project sponsor is Iqbal Power Limited. Power output is 132 MW and Water and Power Development Authority (WAPDA) of Pakistan would purchase electric energy generated by the project. ACS was commissioned by IQBAL POWER Ltd to prepare and administer the turnkey contract tender documents whereby international contractor were invited to participate in the project. |
|
|